Download Smartglass Brochure
spaces that adapt to users’ needs at the flick of a switch.
Gehry Partners and Foster + Partners have won the job to design phase 3 of the Battersea Power Station redevelopment.
Phase 3, which is otherwise known as the High Street, will comprise two major residential development zones along a retail pedestrian street from the northern line extension station.
It will consist of 1,200 flats, a 200-room hotel overlooking both the town square and the Power Station, 350,000 sq ft of retail and restaurant space, and a library.
Gehry Partners, is designing the apartments to the east of the High Street – its first buildings in the UK – with Foster + Partners designing the residential buildings to the west.
Head over to Construction Enquirer to read more.
(Source: Construction Enquirer)
Wherever you are in the world one of our team will be in touch to advise on the best smart glass solution for your needs.